Index - Engine

No. Assessment Description
1. ABE-1-6A Assist with fuel oil transfer
2. ABE-5G1A Trace out a piping system image
3. OICEW-1-1A Cut a circular hole using oxyacetylene process
4. OICEW-1-1B Form two steel plates using brazing process
5. OICEW-1-1C Form two steel plates using electric arc welding process
6. OICEW-1-1D Sweat joint
7. OICEW-1-1E Bend copper tube
8. OICEW-1-1F Visual test of welded joint
9. OICEW-1-1G Dye-penetrant test
10. OICEW-10E1B Start and secure oily water separator image
11. OICEW-1E2A Change over control systems image
12. OICEW-2-1A Drill blind hole using drilling machine
13. OICEW-2-1B Thread a blind hole using hand taps
14. OICEW-2-1C External thread using a hand die
15. OICEW-3-1A Plan and use test equipment
16. OICEW-3-1B Troubleshoot electrical motor control system
17. OICEW-3-1C Detect location of grounds
18. OICEW-3-1D Measure insulation resistance
19. OICEW-3-1E Determine phase rotation
20. OICEW-4-1A Inspect machinery spaces before assuming watch
21. OICEW-4-1B Watch Relief
22. OICEW-4-1C Engineering watchkeeping image
23. OICEW-4-1D Monitor engineering machinery image
24. OICEW-4-2A Respond to engine room alarms
25. OICEW-4-3B Prepare and start main gas turbine
26. OICEW-4-3E Monitor main gas turbine operation
27. OICEW-4-3H Secure main gas turbine
28. OICEW-4E3I Monitor and operate auxiliary boiler image
29. OICEW-5-1A Test steering gear and internal communications
30. OICEW-5-1B Start refrigeration system
31. OICEW-5-1C Shut down refrigeration system
32. OICEW-5-1D Start and secure air compressor
33. OICEW-5-1F Start fresh water generator
34. OICEW-5-1G Shut down fresh water generator
35. OICEW-5-1H Start fuel oil or lube oil purifier
36. OICEW-5-1I Shut down fuel oil or lube oil purifier
37. OICEW-5-1J Prepare main propulsion diesel engine for operation
38. OICEW-5-1K Secure main propulsion diesel engine
39. OICEW-5-1L Prepare main steam turbine for operation
40. OICEW-5-1M Monitor main steam turbine operation
41. OICEW-5-1N Secure main steam turbine operation
42. OICEW-5-2A Light off main boiler
43. OICEW-5-2B Secure main boiler
44. OICEW-5-2C Bottom blow boiler
45. OICEW-5-2D Test and treat boiler water
46. OICEW-5E2B Ballast and deballast a tank image
47. OICEW-6-1A Transfer fuel
48. OICEW-6-1B Operate fire pump
49. OICEW-6-2A Pump bilges
50. OICEW-7-1A Start emergency generator
51. OICEW-7-1B Inspect and start a diesel engine
52. OICEW-7-1C Pre-start inspection of steam turbo-generator
53. OICEW-7-1D Connect ship service diesel generator to main switchboard
54. OICEW-7-1E Parallel generators
55. OICEW-7E4A Disassemble and reassemble an electric motor image
56. OICEW-7E5C Test engine shutdown devices image
57. OICEW-8-1A Lathe project
58. OICEW-8-2A Centrifugal pump maintenance (mechanical seal)
59. OICEW-8-2B Reciprocating pump maintenance
60. OICEW-8-2C Gear pump maintenance
61. OICEW-8-2D Inspect valve manifold
62. OICEW-8-2E Overhaul valve
63. OICEW-8-2F Overhaul heat exchanger
64. OICEW-8E2A Make emergency repairs image
65. OICEW-8E2B Centrifugal pump maintenance (packing) image
66. OICEW-8E2D Replace flange gasket image
67. OICEW-8E3A Clean an oil purifier image
68. OICEW-9-1B Monitor sewage waste treatment plant
69. OICEW-9-1C Monitor oily water separator system
70. RFPEW-1H2C Shift and clean a basket-type duplex strainer image
71. RFPEW-5-2E Change and clean burner