OICEW-5-1G
Shut down fresh water generator
Condition
Using an approved simulator, in the laboratory, or aboard ship and given access to a fresh water generator.
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Identify the valves and pumps associated with the freshwater generator started in assessment OICEW-5-1F |
Identify:
|
Line up distillate discharge to the bilge | |
Secure the freshwater generator |
Follow the ship specific evaporator securing procedure provided during training |
See the Engineering Assessment Guidelines for additional specifications of behavior and standards.
Note: This assessment supports KUP OICEW-A4.1, and is assessed in EN-4231 Sea Term IV: Marine Engineering.