OICEW-1-1D
Sweat joint
Condition
In a workshop/laboratory or other safe working environment, given proper tools, lighting, ventilation, and 1/2 inch copper tube and coupling.
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Plan fabrication of sweat joint fitting | |
Use:
Prepare joint by cleaning and fluxing | |
Test joint for tightness |
Prove joint leak free |
Job Specifications
See the Engineering Assessment Guidelines for additional specifications of behavior and standards.
Note: This assessment supports KUP OICEW-C1.6, and is assessed in ST-0999E Sea Term I (Engineering Portion).