OICEW-4-3B
Prepare and start main gas turbine
Condition
On a gas-turbine vessel of at least 1,000 HP at sea, on a simulator, or in a laboratory
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Check for sufficient electrical capacity |
|
Prepare main gas turbine for start |
|
Start main gas turbine engines |
|
See the Engineering Assessment Guidelines for additional specifications of behavior and standards.
Note: This assessment supports KUP OICEW-A4.3, and is assessed in EN-3233 Steam and Gas Turbines.