OICEW-8-2D
Inspect valve manifold
Condition
Aboard ship or in workshop, given a piping diagram and other equipment needed to complete the task.
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Lockout/tagout valve manifold |
Identify contents of pipe Isolate pipe section Relieve pressure and drain section |
Use tools to open up piping for inspection |
Use:
|
Dismantle flanges Inspect interior of pipe Clean and prepare joints for reassembly | |
Use tools and proper joint materials to close up piping system |
Use:
|
Test system to identify leaks |
Perform hydrostatic test for leakage Prove joint leak free |
See the Engineering Assessment Guidelines for additional specifications of behavior and standards.
Note: This assessment supports KUP OICEW-C2.3, and is assessed in EN-2231 Sea Term II: Marine Engineering.