OICEW-5E2B
Ballast and deballast a tank
Condition
On a vessel of at least 1,000 HP, on a simulator, or in a laboratory.
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Plan Ballasting operation |
|
Line up Ballast system to fill the ballast tank |
|
Line up Ballast system to empty the ballast tank |
|
| |
| |
Secure ballast pump and ballast system |
|
See the Engineering Assessment Guidelines for additional specifications of behavior and standards.
Note: This assessment supports KUP OICEW-A5.2, and is assessed in EN-3131 Steam Generators.