RFPEW-1H2C
Shift and clean a basket-type duplex strainer
Condition
Aboard ship, in the laboratory, or in an approved simulator given access to proper equipment and manufacturer’s technical manual.
Performance requirement
| Behavior | Standard |
|---|---|
| The student will: | During assessment, the student shall, at a minimum: |
|
Change over a basket-type strainer to a clean basket |
|
| |
|
Reassemble the strainer basket and lid |
|
See the Engineering Assessment Guidelines for additional specifications of behavior and standards.
Note: This assessment supports KUP RFPEW-A1.3, and is assessed in EN-1211 Auxiliary Machinery I.
