Assessment OICEW-9-1A
Monitor sanitary flushing water system
Assessed in EN-2231 Sea Term II: Marine Engineering
Condition
Aboard ship or in an approved simulator, given access to a sanitary flushing water system and proper tools and equipment.
Performance Requirements
| Behavior | Standard |
|---|---|
| The student will: | During assessment, the student shall, at a minimum: |
|
Identify the source of flushing water |
Identify operating sanitary pump Identify alternate sources |
|
Describe the operation of the hydro-pneumatic tank |
State purpose of air cushion State corrective action for short cycling |
|
Monitor the sanitary pump |
Check operating pressure Check motors for overheating/vibrations Check strainer pressure differential |
|
Monitor the hydro-pneumatic tank |
Note cut-in and cut-out pressures |
Supports Table A-III/1 officers in charge of an engineering watch
| Competence | Knowledge, Understanding & Proficiency | Task |
|---|---|---|
|
Ensure compliance with pollution- prevention requirements |
D1.2 Anti-pollution procedures and all associated equipment |
Monitor sanitary flushing water system |
Published: 2016-10-28-04:00