
Assessment OICEW-7-1B
Pre-start inspection of diesel generator
Assessed in EN-4131 Internal Combustion Engines II
Condition
Aboard ship, in the laboratory, or in an approved simulator given access to proper equipment and manufacturer’s technical manual.
Performance Requirements
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Check mechanical condition of engine |
Check:
|
Check engine lubrication |
Check dipstick for sufficient oil |
Check engine cooling |
Check expansion tank for sufficient water Check no obstructions blocking cooling fan |
Check engine fuel system |
Check level in fuel tank Verify alignment of fuel system |
Check engine starting system |
For hydraulic start:
For Electric start:
|
Supports Table A-III/1 officers in charge of an engineering watch
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.1 Basic construction and operation principles of machinery systems, including:
|
Pre-start inspection of diesel generator |
Published: 2016-10-28-04:00