
Assessment OICEW-5-2B
Secure main boiler
Assessed in EN-3233 Steam and Gas Turbines
Condition
In an approved simulator or aboard a ship in port or at anchor, given access to a main boiler.
Performance Requirements
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Secure boiler |
Reduce load on boiler Place combustion control on manual Secure fires Open superheater vents and drains |
Secure forced draft fan | |
Monitor boiler until stabile |
Maintain water level in drum Open drum vent before pressure falls to 0 psi |
Supports Table A-III/1 officers in charge of an engineering watch
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.1 Basic construction and operation principles of machinery systems, including:
|
Secure main boiler |
Published: 2016-10-28-04:00