
Assessment OICEW-5-1D
Start air compressor
Assessed in EN-2111 Auxiliary Machinery II
Condition
Using an approved simulator, in the laboratory, or aboard ship and given access to an air compressor.
Performance Requirements
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Check unit for readiness to start |
Inspect mechanical condition of equipment Observe sufficient lubricating oil Blow down receiver and moisture traps On water cooled units, verify coolant flow |
Line-up compressor |
Verify compressor discharge valve is open |
Start compressor |
press start button verify control set to automatic |
Monitor operation of air compressor |
Verify operation of unloader Verify operation of cut-in and cut-out switches |
Supports Table A-III/1 officers in charge of an engineering watch
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.1 Basic construction and operation principles of machinery systems, including:
|
Start air compressor |