
Assessment OICEW-5-1C
Shut down refrigeration system
Assessed in EN-3213 Refrigeration
Note: Not all steps are possible on all refrigeration systems.
Condition
Using an approved simulator, in the laboratory, or aboard ship and given access to an operating refrigeration system.
Performance Requirements
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Secure the refrigerant circuit |
Close the receiver outlet valve Pump down the receiver Observe suction pressure |
Secure the refrigeration compressor |
Observe compressor stop on low pressure cut-out De-energize the compressor Close compressor suction and discharge valves |
Secure associated equipment |
Secure secondary refrigerant loop, if used Secure box solenoid, if shutting down |
Secure the cooling water supply |
Close valves and secure pumps as required |
Supports Table A-III/1 officers in charge of an engineering watch
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.1 Basic construction and operation principles of machinery systems, including:
|
Shut down refrigeration system |