Assessment OICEW-4-3B
Prepare and start main gas turbine
Assessed in EN-3233 Steam and Gas Turbines
Condition
On a gas-turbine vessel of at least 1,000 HP at sea, on a simulator, or in a laboratory
Performance Requirements
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Check for sufficient electrical capacity |
|
Prepare main gas turbine for start |
|
Start main gas turbine engines |
|
Supports Table
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.3 Preparation, operation, fault detection and necessary measures to prevent damage for the following machinery items and control systems:
|
Prepare and start main gas turbine |
Published: 2016-10-28-04:00