OICEW Task 4.3.Q
Shut down fresh water distiller
MMA Method
In order to satisfy NVIC 17-14 Task 4.3.Q , MMA students must:
- Successfully complete MMA Assessment OICEW-5-1G Shut down fresh water generator
NVIC Method
| STCW Competence | Knowledge, Understanding, and Proficiency | |
|---|---|---|
| Operate main and auxiliary machinery and associated control systems | OICEW-A4.3 Preparation, operation, fault detection and necessary measures to prevent damage for the following machinery items and control systems Auxiliary prime movers and associated systems | 
| Condition | Behavior | Standard | 
|---|---|---|
| On a steam vessel of at least 1,000 HP, on a simulator, or in a laboratory, | the candidate plans for and shuts down the freshwater distiller, describing actions as they are being performed. Note 2
A candidate who does not perform this task will receive an endorsement that is limited to motor and/or gas-turbine propelled vessels without distilling plants.
 | The candidate: 
 | 