OICEW Task 4.3.Q
Shut down fresh water distiller
MMA Method
In order to satisfy NVIC 17-14 Task 4.3.Q , MMA students must:
- Successfully complete MMA Assessment OICEW-5-1G Shut down fresh water generator
NVIC Method
STCW Competence | Knowledge, Understanding, and Proficiency | |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
OICEW-A4.3 Preparation, operation, fault detection and necessary measures to prevent damage for the following machinery items and control systems Auxiliary prime movers and associated systems |
Condition | Behavior | Standard |
---|---|---|
On a steam vessel of at least 1,000 HP, on a simulator, or in a laboratory, |
the candidate plans for and shuts down the freshwater distiller, describing actions as they are being performed. Note 2
A candidate who does not perform this task will receive an endorsement that is limited to motor and/or gas-turbine propelled vessels without distilling plants.
|
The candidate:
|