ABE Task 4.1.A
Operation of bilge and ballast system
MMA Method
In order to satisfy NVIC 18-14 Task 4.1.A , MMA students must:
- Successfully complete MMA Assessment OICEW-5E2B Ballast and deballast a tank
- Successfully complete MMA Assessment OICEW-6-2A Pump bilges
NVIC Method
STCW Competence | Knowledge, Understanding, and Proficiency | |
---|---|---|
Contribute to bilge and ballast operations |
ABE-A7.1 Knowledge of the safe function, operation and maintenance of the bilge and ballast systems, including: .1 reporting incidents associated with transfer operations |
Condition | Behavior | Standard |
---|---|---|
On a vessel or in a laboratory or workshop, given a bilge and ballast system, |
the candidate assists the officer on watch with the operation of the bilge and ballast system in accordance with good engineering principles. |
The candidate:
|