NVIC Method
| STCW Competence | Knowledge, Understanding, and Proficiency |
|---|---|
|
Contribute to the safe operation of deck equipment and machinery |
ABD-C1.3 Use and handling of deck and cargo-handling gear and equipment pipeline systems – bilge and ballast suctions and wells |
| Condition | Behavior | Standard |
|---|---|---|
|
On board ship, or in a laboratory, |
the candidate traces out and describes a piping system specified by the assessor. |
The candidate’s description includes:
|
MMA Method
In order to satisfy NVIC 14-14 Task 4.11.A , MMA students must:
- Successfully complete MMA Assessment ABD-4J11A Trace out and describe a piping system