RFPEW Task 1.1.H(S)
Monitor steam distilling plant
MMA Method
In order to satisfy NVIC 07-14 Task 1.1.H(S) , MMA students must:
- Successfully complete MMA Assessment OICEW-4-1D Monitor engineering machinery
NVIC Method
STCW Competence | Knowledge, Understanding, and Proficiency | |
---|---|---|
Carry out a watch routine appropriate to the duties of a rating forming part of an engine-room watch. |
RFPEW-A1.2 Engine-room watchkeeping procedures |
Condition | Behavior | Standard |
---|---|---|
On a steam vessel at sea or at anchor in clean water, on a simulator, or in a laboratory, |
the candidate monitors steam distilling plant. Note 1
Not performing this task will limit the candidate’s endorsement to motor and/or gas-turbine propelled vessels only.
This task is not required for steam propulsion and no limitation will be placed on the steam vessel endorsement if this task is not completed. |
The candidate:
|