RFPEW Task 1.1.H(M/G)
Monitor reverse osmosis plant
MMA Method
In order to satisfy NVIC 07-14 Task 1.1.H(M/G) , MMA students must:
- Successfully complete MMA Assessment OICEW-4-1D Monitor engineering machinery
NVIC Method
STCW Competence | Knowledge, Understanding, and Proficiency | |
---|---|---|
Carry out a watch routine appropriate to the duties of a rating forming part of an engine-room watch. |
RFPEW-A1.2 Engine-room watchkeeping procedures |
Condition | Behavior | Standard |
---|---|---|
On a motor or gas turbine vessel at sea or at anchor in clean water, on a simulator, or in a laboratory, |
the candidate monitors a reverse osmosis plant. Note 2 Note 6 May be used as substitute for Task No.
|
The candidate:
|