OICEW Task 8.2.D
Replace a flange gasket
MMA Method
In order to satisfy NVIC 17-14 Task 8.2.D , MMA students must:
- Successfully complete MMA Assessment OICEW-8E2D Replace flange gasket
NVIC Method
STCW Competence | Knowledge, Understanding, and Proficiency | |
---|---|---|
Appropriate use of hand tools, machine tools and measuring instruments for fabrication and repair on board |
OICEW-C1.7 Use of various types of sealants and packings |
Condition | Behavior | Standard |
---|---|---|
On a vessel of at least 1,000 HP, or in a laboratory or workshop, |
the candidate replaces a flange gasket. All
The assessment is required for all OICEW endorsements regardless of any limitations for propulsion mode and/or vessel equipment.
|
The candidate:
|