OICEW Task 8.2.C
Repack a valve
MMA Method
In order to satisfy NVIC 17-14 Task 8.2.C , MMA students must:
- Successfully complete MMA Assessment OICEW-8-2E Overhaul valve
NVIC Method
| STCW Competence | Knowledge, Understanding, and Proficiency | |
|---|---|---|
| Appropriate use of hand tools, machine tools and measuring instruments for fabrication and repair on board | OICEW-C1.7 Use of various types of sealants and packings | 
| Condition | Behavior | Standard | 
|---|---|---|
| On a vessel of at least 1,000 HP, or in a laboratory or workshop, | the candidate repacks a valve. All
The assessment is required for all OICEW endorsements regardless of any limitations for propulsion mode and/or vessel equipment.
 | The candidate performs the operations as follows: 
 | 
