ABD Task 4.8.C

Demonstrate rigging and unrigging a gangway

MMA Method

In order to satisfy NVIC 14-14 Task 4.8.C , MMA students must:

NVIC Method

See NVIC method.

STCW Competence Knowledge, Understanding, and Proficiency

Contribute to the safe operation of deck equipment and machinery

ABD-C1.2 Knowledge of the following procedures and ability to rig and unrig pilot ladders, hoists, rat guards, and gangways

Condition Behavior Standard

On board ship or in a laboratory,

the candidate rigs and unrigs a gangway.


The candidate:

  1. Inspects gangway for cracks, broken steps, frozen block and tackle, or missing parts;
  2. Sets up gangway in preparation for use;
  3. Brings gangway aboard in preparation for departure; and
  4. Breaks down gangway and secures it for sea.