ABD Task 4.8.B

Describe rigging and unrigging rat guards

MMA Method

In order to satisfy NVIC 14-14 Task 4.8.B , MMA students must:

NVIC Method

See NVIC method.

STCW Competence Knowledge, Understanding, and Proficiency

Contribute to the safe operation of deck equipment and machinery

ABD-C1.2 Knowledge of the following procedures and ability to rig and unrig pilot ladders, hoists, rat guards, and gangways

Condition Behavior Standard

On board ship or in a laboratory, when asked by a Qualified Assessor,

the candidate describes how to rig and unrig rat guards.


The candidate’s description includes:

  1. Inspection for condition and securing lines attached; and
  2. Installing rat guards on lines and other shore connections.