OICNW-3-3P

Convert Route Plan to a Route

Condition

On an operational ECDIS that meet the standards of IMO resolution MCS.232(82) 5 Dec 2006 revised performance standards for Electronic Chart Display and Information Systems (ECDIS) or an ECDIS simulator that meets applicable national and international performance standards for ECDIS.

Performance requirement

Behavior Standard
The student will: During assessment, the student shall, at a minimum:

Demonstrate converting the Route Plan to a Route in preparation for sailing.

Demonstrate loading route and activating route within 45 seconds.


Note: This assessment supports KUP OICNW-A4.2, and is assessed in MT-3224 Electronic Chart Display & Information System (ECDIS).