OICNW-1-6A
Steering gear test
Condition
On a vessel or a full mission ship simulator.
Behavior |
Standard |
The student will: |
During assessment, the student shall, at a minimum: |
Conduct the pre-departure test of the vessel’s steering gear.
|
- The steering control system is turned on.
- The steering gyro repeater is aligned with the master gyro-compass.
- After the required warm up period, the controls for switching pumps and motors between the port and starboard steering systems are tested.
- Both port and starboard steering systems are tested as follows:
- When the control is switched to hand steering, the rudder is tested throughout its full range of motion.
- When the control is switched to non follow-up, the rudder is tested throughout its full range of motion.
- Change the steering mode from auto plot to hand and back.
|
or MT-3372. Shall be completed by the end of MT-4371.
Note: This assessment supports KUP OICNW-A1.08, and is assessed in MT-4371 Sea Term IV: Marine Transportation.