NVIC Method
Show NVIC method.
|  STCW Competence  | 
 Knowledge, Understanding, and Proficiency  | 
| 
           Operate main and auxiliary machinery and associated control systems 
         | 
            OICEW-A4.3  Preparation, operation, fault detection and necessary measures to prevent damage for the following machinery items and control systems 
          Auxiliary prime movers and associated systems 
         | 
|   Condition  |  Behavior  | Standard  | 
| 
           On a motor vessel of at least 1,000 HP, on a simulator, or in a laboratory, 
         | 
           the candidate plans for and starts up the freshwater generator, describing actions as they are being performed. 
          
  
          
         | 
           The candidate: 
          
            - 
              
Opens the brine pump/eductor overboard skin valve; 
             
            - 
              
Opens the brine pump eductor saltwater supply valve; 
             
            - 
              
Opens the vacuum pump/eductor saltwater supply valve; 
             
            - 
              
Opens the saltwater feed pump discharge and suction valves; 
             
            - 
              
Starts the saltwater feed pump to supply both the evaporator eductors; 
             
            - 
              
Closes the vacuum breaker valve atop the evaporator shell; 
             
            - 
              
Adjusts the brine overboard discharge valve to maintain water level to just cover submerged tube nest in bottom of distiller; 
             
            - 
              
Delays continuing with operation until 75% of operational vacuum is attained; 
             
            - 
              
Opens the main heat source valve to distiller heating section; 
             
            - 
              
Adjusts the main-engine jacket water distiller heating section outlet valve to maintain proper jacket-water temperature differential between inlet and outlet; 
             
            - 
              
Adjusts the saltwater feed to distiller to maintain proper inlet temperature; 
             
            - 
              
Continues to regulate the brine overboard pump discharge to maintain seal and brine level; 
             
            - 
              
Starts the distillate pump; 
             
            - 
              
Energizes the salinity indicating panel and verifies the three- way valve is de-energized and distillate is re-circulated to the evaporator; 
             
            - 
              
Energizes the salinity indicating panel and verifies the three- way valve is de-energized and distillate is re-circulated to the evaporator; 
             
            - 
              
Continues to adjust the saltwater supply valve, controlling saltwater feed temperature, and brine overboard flow rate; 
             
            - 
              
Monitors the distillate pump salinity level output; 
             
            - 
              
Verifies the tank to be replenished is lined up; 
             
            - 
              
Energizes the three-way valve when the distillate salinity level is below alarm level; 
             
            - 
              
Verifies the salinity meter reading by comparing to chemical test of a 50 ml sample; 
             
            - 
              
Records the meter reading once discharge to tank has been established; and 
             
            - 
              
Takes proper action to prevent safety and pollution violations. 
             
           
         | 
 
MMA Method
In order to satisfy   NVIC 17-14 Task 4.3.N  , MMA students must:
  - Successfully complete MMA Assessment OICEW-5-1F Start fresh water generator