OICEW-7-1E
Parallel generators
Function: Electrical, electronic and control engineering at the operational level
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate electrical, electronic and control systems |
B1.1 Basic configuration and operation principles of the following electrical equipment:
|
Parallel generators |
Assessed in: EN-3111L Electrical Machines Lab
Condition
Aboard ship, in the laboratory, or in an approved simulator given access to proper equipment and manufacturer technical manual.
Behavior
Plan and parallel in-coming unit with operating unit, describing actions as they are being performed.
Standard
- Plan reflects proper sequence of actions, is complete, and conforms to the requirements of manufacturer’s instructions and ship’s procedures;
- Parallel of the on-coming unit with operating unit is successful and conducted according to plan;
- Actions taken are correctly and completely described;
- Required steps taken are verified by assessor utilizing sample checklist as a guide;
- No safety violations are observed.