OICEW-7-1B
Pre-start inspection of diesel generator
Function: Marine engineering at the operational level
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.1 Basic construction and operation principles of machinery systems, including:
|
Pre-start inspection of diesel generator |
Assessed in: EN-4131 Internal Combustion Engines II
Condition
Aboard ship, in the laboratory, or in an approved simulator given access to proper equipment and manufacturer’s technical manual.
Behavior
Plan and conduct a pre-start-up inspection of a diesel generator, describing actions as they are being performed.
Standard
- Plan reflects proper sequence of actions, is complete, and conforms to the requirements of manufacturer’s instructions and ship’s procedures;
- Pre- start up inspection of the prime mover and alternator is successful and conducted according to plan;
- Actions taken are correctly and completely described;
- Required steps taken are verified by assessor utilizing sample checklist as a guide;
- No safety violations are observed.