OICEW-5-1M
Monitor main steam turbine operation
Function: Marine engineering at the operational level
Competence | Knowledge, Understanding & Proficiency | Task |
---|---|---|
Operate main and auxiliary machinery and associated control systems |
A4.1 Basic construction and operation principles of machinery systems, including:
|
Monitor main steam turbine operation |
Assessed in: EN-2231 Sea Term II Engine
Condition
In an approved simulator or aboard a ship underway, given access to a main steam turbine.
Behavior
Plan for and monitor an operating main steam turbine, describing actions as they are being performed.
Standard
- Plan reflects proper sequence of actions, is complete, and conforms to the requirements of manufacturer’s instructions and ship’s procedures;
- Main steam turbine is successfully monitored according to plan*;
- Actions taken are correctly and completely described;
- Required steps taken are verified by assessor utilizing sample checklist as a guide;
- No safety violations are observed. *Note: Because of the physical separations and complexity of the tasks involved in demonstration of this proficiency, the assessment may be accomplished in segments during successive operational opportunities aboard ship.