Mass. Maritime Academy More Patriot State Equipment Removal
 
4holdTurbine picture
1/c Mike Cedrone observes as 1/c B. Kenny rigs the HP reaction turbine in #4 hold


4holdTurbine2 picture 4holdTurbine3 picture
Cadets prepare to put the reaction turbine rotor on to the cradle


hpStuds2 picture
1/c S. Sylvester, 2/c Katie Wall, 2/c C. Lydon prepare to remove turbine casing nuts


hpStuds picture
1/c Sylvester, 2/c Katie Wall, 1/c Tim Fitzgerald remove turbine casing nuts


hpTurbineDisassembly2 picture
Professor McMurray setting a chain hoist to remove lower casing nuts


rotorCradleMaking picture rotorCradleMaking2 picture
1/c Bob Kenny, Professor McMurray, 2/c C. Lydon making a cradle for the reaction turbine rotor in #4 hold


Sylvester-HP picture
1/c Steve Sylvester prepares to remove casing nuts while 2/c Kate Wall & Jessie Stevenson? Assist.


Wall-york picture
2/c Kate Wall assisting in preparations for the York Compressor removal


yorkCompressorRemoval picture
Cadet ? (Firewatch) and Bos’n Vick Cordeira burns a pipe in preparation for York Compressor removal.


yorkCompressorRemoval2 picture
Jessie Stevenson assists in the rigging of the York Compressor


York picture York2 picture
2/c Katie Wall, Jessie Stevenson, 1/c Tim Fitzgerald remove a gate valve to clear a path for the York compressor removal